Categories: SSC Coaching

Quality LCM Word Problems by SSC CGL Coaching in Delhi

Arithmetic is considered the mainstay of Quantitative Aptitude section in competitive exams such SSC CGL and Bank PO. Questions based on LCM are among the most scoring ones within arithmetic.
Vidya Guru, the centre for Best SSC Coaching in Delhi / NCR, has provided below a few quality word problems on LCM. They will enhance your conceptual clarity and help you get a better grip on the topic. Thus, we suggest that you attempt each of them.

Basic Level
Question-1. Mary and John are both practicing for a math competition. Mary practices every 5 days, and John practices every 7 days. If they both started practicing on the same day, on what day will they both be practicing again on the same day?

Solution: To find the day when they will both practice on the same day, we need to find the LCM of 5 and 7. The multiples of 5 are: 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, … and the multiples of 7 are: 7, 14, 21, 28, 35, 42, 49, … The smallest number that appears in both lists is 35, so they will both be practicing on the same day 35 days after they started.

Question-2. A factory produces three types of products. Product A is produced every 4 days, product B is produced every 6 days, and product C is produced every 8 days. If the factory produces all three products on the same day, how long will it take for them to produce all three products on the same day again?

Solution: To find the day when all three products will be produced on the same day again, we need to find the LCM of 4, 6, and 8. The multiples of 4 are: 4, 8, 12, 16, 20, 24, 28, 32, 36, 40, 44, 48, … the multiples of 6 are: 6, 12, 18, 24, 30, 36, 42, 48, … and the multiples of 8 are: 8, 16, 24, 32, 40, 48, … The smallest number that appears in all three lists is 24, so it will take 24 days for the factory to produce all three products on the same day again.

Question-3. Sarah and Tom are painting a wall together. Sarah can paint the wall in 12 hours, and Tom can paint the wall in 16 hours. If they work together to paint the wall, how long will it take them to finish?

Solution: To find the time it takes for them to finish painting the wall together, we need to find the LCM of 12 and 16. The multiples of 12 are: 12, 24, 36, 48, 60, 72, 84, 96, … and the multiples of 16 are: 16, 32, 48, 64, 80, 96, … The smallest number that appears in both lists is 48, so it will take them 48/3 = 16 hours to finish painting the wall together, where we divide by 3 as both workers work together.

Higher Level
Question-4. Three cyclists start riding from a point at the same time. The first cyclist rides every 6 minutes, the second cyclist rides every 8 minutes, and the third cyclist rides every 10 minutes. After how many minutes will they meet at the starting point again?

Solution: We need to find the LCM of 6, 8, and 10. The multiples of 6 are: 6, 12, 18, 24, 30, 36, 42, 48, 54, 60, … the multiples of 8 are: 8, 16, 24, 32, 40, 48, 56, 64, 72, 80, … and the multiples of 10 are: 10, 20, 30, 40, 50, 60, 70, 80, … The smallest number that appears in all three lists is 120. Therefore, they will meet at the starting point again after 120 minutes.

Question-5. A train starts from station A and another train starts from station B at the same time. The first train travels at a speed of 40 km/h and the second train travels at a speed of 60 km/h. The distance between the two stations is 600 km. After how much time will the two trains meet?

Solution: The two trains are moving towards each other, so their relative speed is the sum of their speeds, which is 40 km/h + 60 km/h = 100 km/h. The time taken to cover the distance between the two stations is equal to the distance divided by the relative speed, which is 600 km/100 km/h = 6 hours.

Question-6. A factory produces three types of products. Product A is produced every 5 days, product B is produced every 7 days, and product C is produced every 9 days. If the factory produces all three products on the same day, how long will it take for them to produce all three products on the same day again?

Solution: We need to find the LCM of 5, 7, and 9. The multiples of 5 are: 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60, … the multiples of 7 are: 7, 14, 21, 28, 35, 42, 49, 56, 63, 70, … and the multiples of 9 are: 9, 18, 27, 36, 45, 54, 63, 72, … The smallest number that appears in all three lists is 315. Therefore, it will take 315 days for the factory to produce all three products on the same day again.

Vidya Guru

Recent Posts

Excellent March Current Affairs by Top SSC Coaching Institute in Delhi

Getting ready for the SSC exam in Delhi? Seek no further than Vidyaguru for superior coaching to conquer this competitive…

4 weeks ago

Excellent February Current Affairs by Best IBPS PO Coaching Institute in Delhi

Preparing for the IBPS PO exam in Delhi? Look no further than Vidyaguru for the best coaching to crack this…

2 months ago

Superlative February Current Affairs by Top SSC Coaching Institute

Vidyaguru is one of the top SSC coaching institutes in Delhi which has been supporting young people to successfully qualify…

2 months ago

Great January Current Affairs by SSC CGL Exam Coaching in Delhi

Cracking SSC CGL? Current affairs questions often end up being a roadblock. But not anymore with Vidyaguru! Vidyaguru designs the…

3 months ago

Superb January Current Affairs by Best SBI PO Coaching Institute Delhi

When it comes to SBI exam preparation, Vidyaguru stands tall as the most trusted coaching institute. For decades, Vidyaguru has…

3 months ago

Great January Current Affairs by Best Bank PO Coaching Institute in Delhi

When it comes to SSC and bank exam preparation, Vidyaguru stands out as the premier coaching institute. With decades of…

3 months ago